GMW 8287 PDF

May 17, 2019 posted by

Find the most up-to-date version of GMW-R – GMW at Engineering GMW GMW GMW Additional References. EIA/JEDEC JESDAB. © Copyright General Motors Corporation All Rights. It is suggested to be at least 10 minutes in both IPC A and GMW For screening purposes (HASS, ESS), also depend on the stress limits being.

Author: Vugul Nisida
Country: Netherlands
Language: English (Spanish)
Genre: Literature
Published (Last): 7 November 2012
Pages: 447
PDF File Size: 5.75 Mb
ePub File Size: 16.8 Mb
ISBN: 481-5-27415-215-4
Downloads: 10276
Price: Free* [*Free Regsitration Required]
Uploader: Dora

This process begins with a basic screening template, and the development process should define the parameters of the template. It is recommended that this Verification HALT be performed on all but the least significant of engineering changes. The product is damaged and does not recover when the stress is reduced i.

Documentation shall detail the occurrences of sample degradation and the conditions at which they occurred, including the operating and destruct limits of the sample and any other important comments.

Significant degradation in these margins could pose a significant risk to the screening process in that the previously demonstrated “Safety of HASS” would have become invalid.

The following are the decision points to be considered: This HALT may use larger 2 X increments for the step stress environments and more attention given to the stress levels that are of concern, i. This section of the standard defines the methods or activities that are performed during the actual process of performing a HALT on a product in a test facility. Ten percent of this value is For Design Improvement Purpose.

  MANUAL DE PSICOPATOLOGIA Y TRASTORNOS PSICOLOGICOS VICENTE CABALLO PDF

These changes could be due to redesign or vendor changes. The screen is designed to precipitate, and then detect, weaknesses using a varying mixture of the HALT stresses. Note the cause of the failure and reduce the “strength” of the appropriate failure mechanism temperature or vibration. Examples of appropriate accelerometers are PCB brand models A10 and C22 examples only, similar products may be used.

The customer and contract manufacturer should agree prior to this step as to clear definition of “without incident”. A typical fmw circumstance would be “when the phase change of materials is close in temperature to the operating limit. Complete functional testing immediately follows the dwell period and may gms be performed throughout the step. These product specific stresses are incorporated into the functional testing and should be performed at each level of stress throughout the HALT process.

Durability Growth through HALT/HASS and Accelerated Testing

A typical location would be on top of a large non-heat generating chip. High vibration levels will quickly accelerate the fracture of weak design areas, however, the weakness will frequently not become evident until the product is returned to a low vibration levels, allowing the fractured joints to become intermittent. The modified operational limits have a reduced range to insure that chamber over-shoot does not cause destructive failure.

The nitrogen should reside outside the building and is connected via the shortest possible distance to the HALT chamber within the building.

  GUJARAT JANTRI PDF

Durability Growth through HALT/HASS and Accelerated Testing – ppt video online download

Each weakness detected, represents an opportunity to take corrective action prior to shipping large quantities of flawed product. Consider the HALT related numerical values and procedures a general guideline. Corrective action CA implemented 4. Constant monitoring should provide functional coverage gme is as complete as possible. Record this value as LOLthermal-tstat. The design or process changes to the product must be incorporated in the?

Based upon the accuracy required for failure point definition and the time available for testing. Note that the functional test should be performed throughout the step, however it must minimally be performed at the conclusion of the ten-minute dwell.

Statistically significant trends within the control limits should be taken seriously with immediate reaction. Identification of the person s who performed the 82287 The verification type HALT can be used as a Process Validation step to insure that design margins demonstrated during development are maintained with full production processes in effect.

Stress Profile Description Typically start from 5 to 10 G rmsThen step down by fixed decrements to the maximum acceleration level with sufficient swell time at each step. No reproduction or networking permitted.